Chapelcross Solar PV and BESS

Project Overview

Elgin Energy EsCo Ltd is seeking to develop a Solar PV and Battery Storage System at Lands owned in and around Chapelcross, Annan DG12 6RF.   

The development will occupy approximately 478 acres/194 ha of agricultural land and will accommodate approximately 150 megawatts (MW) of solar PV and battery storage. A project lifetime of 40 years is proposed. 

 

Key benefits:
The proposed Chapelcross Solar PV and Battery Energy Storage System (BESS) project will allow the generation, storage and release of energy for the entire grid. Contributing to local and national energy targets with additional benefits to include:

  • Solar PV generates electricity renewably, without emitting greenhouse gases or air pollutants.
  • Battery Storage will smooth out the variability associated with the delivery of solar, by storing excess energy when the sun is shining, and delivering it when the opposite is happening;
  • Battery Storage will ensure reliability and resilience of connection, by providing backup power during disruptions;
  • Battery storage reduces Environmental Impact via the integration of more solar because it enables electricity from distributed energy sources to be saved for a later, offsetting the need for building new pollution-emitting peak power plants;

 

Key Project Details

  • Location: Lands owned in and around Chapelcross, Annan DG12 6RF
  • Project size: 150MW of Solar PV and Battery Storage
  • Site area: 478 acres / 194 hectares
  • Grazing: Sheep will graze the site once operational
  • Construction duration: Approx. 6-12 months

Project Booklet


To learn more about the proposed solar PV farm and battery projet at Chapelcross Solar PV and Battery Energy Storage System, please download the project information leaflet.